Complete guide to change your meter name, load, or tariff online through ENC portal with step-by-step instructions.
If you installed a meter under someone else's name and would like to change it, or if you want to change the load and tariff, here is a simple guide for you to follow so that you can easily accomplish these changes.
In the digital age, everything is so easy that you can do it from home. By using ENC (Electronic Neural Network), PITC (Power Information Technology Company) makes it easy for consumers to apply and track their applications.
In the present day, changing the connection details is more convenient than before. Instead of going to the subdivision office for changing details, you can use the official website (ENC) provided by the PITC instead. Here is a step-by-step guide for changing the desired details:
Please attach the following documents with your application:
Change of name/tariff/load does not require these documents, but a new connection does:
Not required for modification applications.
Only needed for new connections.
Only required for new connection applications.
After the submission of the application, you need to print the auto-generated application form, which includes a tracking number. This application form is required for the site inspection.
A demand notice is the official bill issued by the LESCO after verification has been completed. This is the bill that the consumer must pay. There is a meter fee, wire fee, etc., included in this bill.
The consumer must visit the official ENC website in order to print the DN. Follow these steps:
If a consumer needs to change their meter from two phase to three phase, LESCO will begin installation after the demand notice has been paid and the file has been verified.
Your application file must be verified by LESCO officials.
Demand Notice must be paid before installation begins.
LESCO team will inspect the site before meter installation.
New meter will be installed after all verifications.
In addition to new connections, there is also time required for these changes. Below is a list of the time required for each category:
| Connection Category | Load Range | Estimated Processing Time |
|---|---|---|
| Category-1 | 1kW - 15kW | 10-15 Days |
| Category-2 | 16kW - 70kW | 20-30 Days |
| Category-3 | 71kW - 500kW | 30+ Days |
The LESCO Name, Load, and Tariff Change status can be checked at any time by visiting the official site. Here is a complete guide explaining how to check the status:
Usually, it takes 1 to 2 billing cycles after the Demand Notice is paid.
Yes, once your tariff has been verified by LESCO, you can change it from commercial to domestic.
The Wiring Contractor's Test Report is mandatory only in case of change of load or tariff, not for name change.
Yes, you can track your modification application using either the tracking ID or your CNIC number.
If your application is rejected, you will be notified of the reason. You can reapply after addressing the issues mentioned.